Finally we have reached the "target" at approx. 50 ft. below surface. We have glimpsed on the portion of the "white concrete" rock.
This narrative will be paused for a while for obvious reason. We shall resume after we have some significant recovery/retrieval worth sharing with other fellow THunters.
We can be reached at: thu_ong@yahoo.com.
As the dewatering was on progress.
Finally as the white concrete was beginning to be exposed out of the decreasing level of water.
No comments:
Post a Comment